Commit Graph
4 Commits
Author SHA1 Message Date
Axel Dörfler ddcd53aaf0 * Instead of choosing the next thread if we skip one, we now choose the first thread
with a lower priority than the current one.
* Further reduced the probability to skip a thread to roughly 4%, that makes around
  13 skips per second, and about 40 msecs spend in lower priority threads per second
  (with a 3 msec quantum). Might still be too much, but we'll see.


git-svn-id: file:///srv/svn/repos/haiku/haiku/trunk@19719 a95241bf-73f2-0310-859d-f6bbb57e9c96
2007-01-06 12:50:01 +00:00
Axel Dörfler 4621a82e74 Our scheduler skipped over threads in about 30% of all cases - that's a bit much; it's
not a penalty to be the first thread in the run queue...
I've reduced it to about 12.5%, but that might still be too much.


git-svn-id: file:///srv/svn/repos/haiku/haiku/trunk@19710 a95241bf-73f2-0310-859d-f6bbb57e9c96
2007-01-05 19:01:09 +00:00
Michael Lotz 17fee3eab7 Removed the extra info struct in the cpu_ent union and made said union a struct instead. Same as r1137 in NewOS.
git-svn-id: file:///srv/svn/repos/haiku/haiku/trunk@17273 a95241bf-73f2-0310-859d-f6bbb57e9c96
2006-04-29 22:38:19 +00:00
Axel Dörfler d14aab0dca Changed the way how CPU activity is monitored: instead of taking the active
time of the idle thread as a measure, we now compute the CPU activity on
each thread switch - the time the CPU worked is the total of user and kernel
time a thread spent during its quantum.
Unlike before, this mechanism works correctly on SMP machines. I hope this
works as expected :)


git-svn-id: file:///srv/svn/repos/haiku/haiku/trunk@16193 a95241bf-73f2-0310-859d-f6bbb57e9c96
2006-02-01 20:03:55 +00:00